Showing posts with label VAB. Show all posts
Showing posts with label VAB. Show all posts

Refurbishment on Grand Scale for Iconic VAB

 Iconic VAB

The Vehicle Assembly Building at NASA's Kennedy Space Center in Florida has been a landmark to the technological advancements of sending men to the moon and astronauts into space for more than 45 years. But the VAB, as it is best known, is due for major renovations to continue processing launch vehicles and support the subsequent launching of a new generation of astronauts into orbit and deeper into space than ever before.

"This is home improvement, VAB style," said Jose Lopez, who is managing the effort to refurbish a structure that was once the biggest in the world. "We're going for more flexibility and reliability with modern equipment. That building has many systems that haven't been touched up since it was built (in 1965)."

Although the work is massive simply because of the scale of the VAB, Lopez said now is the time to do it and take advantage of the pause in rocket processing that is to end in a couple years. Before another generation of rocket processing kicks in, Lopez said, the VAB must be outfitted with everything it needs to host these rockets and spacecraft assembly for another 40 years.


NASA's Shuttle Discovery To Make Its Final Trip To Launch Pad

http://nasa-satellites.blogspot.com/
Journalists are invited to cover space shuttle Discovery’s last move from the Vehicle Assembly Building (VAB) to Launch Pad 39A on Sept. 20 at NASA’s Kennedy Space Center in Florida. Six astronauts are set to launch aboard the shuttle on Nov. 1. The STS-133 mission to the International Space Station is the final scheduled flight for Discovery before it is retired. Live coverage of Discovery's rollout will air on NASA Television beginning at 8 p.m. EDT. NASA TV’s Video File will broadcast highlights of the move. Discovery's first motion out of the VAB to the pad is scheduled for 8 p.m. The shuttle's 3.4- mile journey atop a giant crawler-transporter is expected to take approximately six hours. Activities include an 8 p.m. photo opportunity of the move followed by an interview availability at 8:30 p.m. with Discovery Flow Director Stephanie Stilson. Media must arrive at Kennedy's news center by 7:30 p.m. for the rollout photo opportunity.

There also will be a sunrise photo opportunity at the launch pad on Sept. 21, following Discovery’s arrival. Reporters need to be at the news center for transportation to the viewing area by 6 a.m. Updates for events are available at 321-867-2525. To attend rollout and the sunrise pad photo opportunity, international journalists must apply by 5 p.m. Sept. 13 to allow time for processing their requests. U.S. media representatives must apply by Sept. 17. Badges for rollout may be picked up starting at 6 a.m., Sept. 20, at the Kennedy Space Center Badging Office on State Road 405. The 11-day mission will be the 35th flight to the station and the 39th flight for Discovery. The mission will deliver and install the Permanent Multipurpose Module, the Express Logistics Carrier 4 - an external platform that holds large equipment - and critical spare components for the space station. Discovery also will deliver Robonaut 2, or R2, to become a permanent resident of the station as the first human-like robot in space.